Author: Charlie Shaddox

Niantic Pump Station Upgrades Showcased in Case Study

The Town of East Lyme used 3D scanning & modeling to develop a model of existing conditions at the station, then design and implement upgrades.

Lewiston Riverfront Master Plan Featured in High-Profile Magazine

Lewiston’s riverfront vision includes reimagining the City’s former industrial district as a live-work-play neighborhood.

East Milton Square Reconstruction Wins ACEC/MA Gold Award

The award recognized the project team’s attention to road safety, along with the construction of a new park in a unique setting.

Weir Creek Restoration Public Meeting Held in Dennis, MA

The project team reviewed modeling results and replacement options for two culverts along a low-lying roadway prone to routine flooding.

Tuscan Village Receives EBC-NE Collaboration Award

The award recognizes collaboration between individuals and organizations resulting in environmental improvements.

Opening Our Second New York Office in Troy

This new location will allow the firm to better service its growing base of clients in New York’s greater Capital Region.

Upcoming Trainings in Wastewater Operations, Hazardous Waste

Our courses are updated for 2024 and approved for Training Contact Hours (TCH).

Highlighting Innovative Methods for Treatment at ATCAVE 2024

Our team will discuss innovative methods to improve the quality of treated water and manage water works systems.

UAV Photogrammetry: A New Tool for Coastal Surveying and Management

Photogrammetry allows for efficient data collection in hard-to-access or hazardous areas.

Our Firm Advances 5 Spots on BBJ’s Largest Engineering Firm Rankings

The Boston Business Journal ranked our firm as the 7th largest engineering company in Mass.