Our Brownfields Work across New England
We work to assess sites, identify funding mechanisms, then design and oversee oversight cleanup while mitigating risk.
The Ecological Benefits of Dam Removal
Removal can achieve both short- and long-term cost savings, while adding resiliency and creating a permanent ecological improvement.
Bristol Ag Landscape Redesign Wins BSLA Merit Award
The renovations were supported by extensive landscape design work which integrated existing and new buildings.
Niantic Pump Station Upgrades Showcased in Case Study
The Town of East Lyme used 3D scanning & modeling to develop a model of existing conditions at the station, then design and implement upgrades.
Lewiston Riverfront Master Plan Featured in High-Profile Magazine
Lewiston’s riverfront vision includes reimagining the City’s former industrial district as a live-work-play neighborhood.
East Milton Square Reconstruction Wins ACEC/MA Gold Award
The award recognized the project teamās attention to road safety, along with the construction of a new park in a unique setting.
Weir Creek Restoration Public Meeting Held in Dennis, MA
The project team reviewed modeling results and replacement options for two culverts along a low-lying roadway prone to routine flooding.
Tuscan Village Receives EBC-NE Collaboration Award
The award recognizes collaboration between individuals and organizations resulting in environmental improvements.
Opening Our Second New York Office in Troy
This new location will allow the firm to better service its growing base of clients in New Yorkās greater Capital Region.
Upcoming Trainings in Wastewater Operations, Hazardous Waste
Our courses are updated for 2024 and approved for Training Contact Hours (TCH).