Repairing and Improving an Important Seawall
Our team was retained by W. H. Peppes General Contractor, Inc. to design repairs and improvements to the existing seawall located at King Park Beach. The repairs were required as a result of the deterioration of existing sections of the seawall.
Repairs included the replacement of several sections of seawall, totaling over 150 linear feet, including a newly designed section. The new section was analyzed for wave loading and scour. Improvements also included the installation of a new concrete parapet above an existing section of seawall that was over 300 feet in length.


